Construction of a 20″ diam multi-product pipeline over 450km with 96 core fiber optic cable for complete length of pipeline. Project includes all site preparation and civil works including buildings with all associated services. Construction of 4 new pump stations each with two pumps (one operating one standby) including firefighting systems. Upgrading of firefighting systems […]

  • Posted in
  • Comments Off on Mombasa – Nairobi Pipeline

Zakhem replaced floor plates in four No. aviation fuel tanks at Accra International Airport, due to a change in the standard utilized by the owner. Floor plates were removed, the base slope under plates was increased and plates were re-laid to new falls. General tank repair, additional nozzle installations and changing of flanges on existing […]

  • Posted in
  • Comments Off on Accra Airport Tank Repairs

The project for PPMC, a subsidiary of NNPC for the rehabilitation of 7.4 kilometers of 16″ petroleum products pipeline, comprised: mobilizing equipment including boats, barges and other pipeline laying equipment; procuring 2,500 meters of 16″ coated pipeline; cutting 4,400 meters of welded concrete pipe located at Akute, Imore\Ilashe, Igegun Island, including transportation to Ijeododo and […]

  • Posted in
  • Comments Off on Emergency Rehabilitation of Atlas Cove – Mosimi Products Pipeline

152 km of 12″ diameter fuel pipeline was rehabilitated. The project supplied 50 km of 12” diameter API 5XL and replaced 42 km of defective segments, repaired various isolated weak points, coated repair with reinstatement of pipeline ROW, resistivity survey, design and install of a new cathodic protection system. It also included pipeline internal cleaning […]

  • Posted in
  • Comments Off on Mosimi Ore Pipeline Rehabilitation

The pipeline consists of 46 km. of 42″ dia. pipeline between the Obite Treatment Centre and the Rumuji Node where the pipeline joins the GTS No. 4 pipeline. The pipeline crosses approximately 16 km. of seasonal swamps where it is concrete coated, road, rail and river crossings. Included in the project was the complete installation […]

  • Posted in
  • Comments Off on OML-58 Upgrade Phase 1 – OUR Gas Pipeline Project

The complete installation of main line pumps, drivers, compressors, and blowers was included in this project. Also included were the supply and installation of new firewater pumps, a water storage tank and other ancillaries related to the fire fighting system, and testing and commissioning of all pump station systems and infrastructure facilities.

  • Posted in
  • Comments Off on Rehabilitation of Abaji Pump Station

The project comprised the detailed design, engineering, procurement, construction and commissioning of 475 km. of 12″ dia., 345 km. of 8″ dia. cross country pipelines, and 12 km. of 16″ dia. river crossing pipeline (completed by directional drilling). Included were all pumping facilities, instrumentation, civil works, mechanical and electrical works, telemetry facilities and the erection […]

  • Posted in
  • Comments Off on Pipeline & Depots Project – Phase III Contract 3

Project comprised the erection of 3 No 330,000 bbl and 2 No 250,000 bbl storage tanks. All complete with installation of piping & fittings, electrical & installation works, structural steel work, painting. Testing & commission was carried out as part of the project.(Excluding the supply of materials.)”

  • Posted in
  • Comments Off on Mombasa Petroleum Storage Tanks Facilities

The preparation of site and associated civil works, and site facilities including fencing, roads, drainage and water supply were included in this project. It also involved construction of the office/control building construction, three workshops, store buildings, gatehouse, fire equipment store building, and pipeline pump shelter, as well as the erection of a firewater tank and […]

  • Posted in
  • Comments Off on Construction of Morendat Pumping Station (PS 23) – Naivash

The project is in three countries: Benin, Togo, and Ghana. It consists of: Benin: 7 km of 10″ diameter pipeline through a major lagoon and a difficult swampy terrain with difficult access to the works and an associated metering station Lomé, Togo: 1.5 km of 10″ diameter pipeline and a metering station Ghana: 1.2 km […]

  • Posted in
  • Comments Off on West African Gas Pipeline Project