intro-03

Zakhem's Projects

047
Zakhem_110500661v

Mosimi Ore Pipeline Rehabilitation

  • Oil - Gas Pipelines
COUNTRY
Nigeria
CLIENT INFORMATION
Nigerian National Petroleum Corporation
PROJECT VALUE
$42 million
DATE AND PERIOD
2005, 12 months
DESCRIPTION
152 km of 12" diameter fuel pipeline was rehabilitated. The project supplied 50 km of 12” diameter API 5XL and replaced 42 km of defective segments, repaired various isolated weak points, coated repair with reinstatement of pipeline ROW, resistivity survey, design and install of a new cathodic protection system. It also included pipeline internal cleaning and replacement of valves as required.
047
Zakhem_110500661v