Category: Construction

Category: Construction

Construction of a 20″ diam multi-product pipeline over 450km with 96 core fiber optic cable for complete length of pipeline. Project includes all site preparation and civil works including buildings with all associated services. Construction of 4 new pump stations each with two pumps (one operating one standby) including firefighting systems. Upgrading of firefighting systems […]

  • Posted in
  • Comments Off on Mombasa – Nairobi Pipeline

Zakhem replaced floor plates in four No. aviation fuel tanks at Accra International Airport, due to a change in the standard utilized by the owner. Floor plates were removed, the base slope under plates was increased and plates were re-laid to new falls. General tank repair, additional nozzle installations and changing of flanges on existing […]

  • Posted in
  • Comments Off on Accra Airport Tank Repairs

Located in the Gold Coast City Development, this is the only five-star property in Accra with 269 rooms, and 24 suites, including two presidential suites. Their expansive conference facilities have more than 1750 sq m of space and are designed to accommodate meetings and events of all sizes. The spa is the largest in West […]

  • Posted in
  • Comments Off on Kempinski Hotel Gold Coast City – Accra

The project for PPMC, a subsidiary of NNPC for the rehabilitation of 7.4 kilometers of 16″ petroleum products pipeline, comprised: mobilizing equipment including boats, barges and other pipeline laying equipment; procuring 2,500 meters of 16″ coated pipeline; cutting 4,400 meters of welded concrete pipe located at Akute, Imore\Ilashe, Igegun Island, including transportation to Ijeododo and […]

  • Posted in
  • Comments Off on Emergency Rehabilitation of Atlas Cove – Mosimi Products Pipeline

The demolition of two existing houses and the construction of a reinforced concrete-framed structure provided five luxury apartments of more than six levels, basement car parking, and a fully air-conditioned building. The finished work was held to an extremely high standard.

  • Posted in
  • Comments Off on 23-24 Kensington Gore – London

The project situated in the Wimbledon area of London comprised the construction of 5 No 2,500 sq.ft secluded, luxury terraced houses each with an integral garage and on an adjacent site the two large luxury detached houses with separate detached double garages. The works included all services and infrastructure works.

  • Posted in
  • Comments Off on Copse Hill Housing – Wimbledon

152 km of 12″ diameter fuel pipeline was rehabilitated. The project supplied 50 km of 12” diameter API 5XL and replaced 42 km of defective segments, repaired various isolated weak points, coated repair with reinstatement of pipeline ROW, resistivity survey, design and install of a new cathodic protection system. It also included pipeline internal cleaning […]

  • Posted in
  • Comments Off on Mosimi Ore Pipeline Rehabilitation

The pipeline consists of 46 km. of 42″ dia. pipeline between the Obite Treatment Centre and the Rumuji Node where the pipeline joins the GTS No. 4 pipeline. The pipeline crosses approximately 16 km. of seasonal swamps where it is concrete coated, road, rail and river crossings. Included in the project was the complete installation […]

  • Posted in
  • Comments Off on OML-58 Upgrade Phase 1 – OUR Gas Pipeline Project

The complete installation of main line pumps, drivers, compressors, and blowers was included in this project. Also included were the supply and installation of new firewater pumps, a water storage tank and other ancillaries related to the fire fighting system, and testing and commissioning of all pump station systems and infrastructure facilities.

  • Posted in
  • Comments Off on Rehabilitation of Abaji Pump Station

The project comprised the detailed design, engineering, procurement, construction and commissioning of 475 km. of 12″ dia., 345 km. of 8″ dia. cross country pipelines, and 12 km. of 16″ dia. river crossing pipeline (completed by directional drilling). Included were all pumping facilities, instrumentation, civil works, mechanical and electrical works, telemetry facilities and the erection […]

  • Posted in
  • Comments Off on Pipeline & Depots Project – Phase III Contract 3