Escravos River Crossing

  • Oil - Gas Pipelines
COUNTRY
Nigeria
CLIENT INFORMATION
Chevron Nigeria Limited
PROJECT VALUE
$48 million
DATE AND PERIOD
2009, 12 months
DESCRIPTION
Approximately 0.5 km. of offshore pipeline was installed parallel to existing 16” pipeline from the Escravos Gas Plant facility to the east bank of the Escravos River.  An installation of 2 km. of river crossing at a maximum depth of 30 m and installation of 2 km. of onshore pipeline to tie in to Nigeria Gas Company 20" existing domestic gas system at the Escravos to Lagos Pipeline System - Escravos Node.