Escravos River Crossing
- COUNTRY
- Nigeria
- CLIENT INFORMATION
- Chevron Nigeria Limited
- PROJECT VALUE
- $48 million
- DATE AND PERIOD
- 2009, 12 months
- DESCRIPTION
- Approximately 0.5 km. of offshore pipeline was installed parallel to existing 16” pipeline from the Escravos Gas Plant facility to the east bank of the Escravos River. An installation of 2 km. of river crossing at a maximum depth of 30 m and installation of 2 km. of onshore pipeline to tie in to Nigeria Gas Company 20" existing domestic gas system at the Escravos to Lagos Pipeline System - Escravos Node.