Integrated Power Generation Plant
- COUNTRY
- Congo
- CLIENT INFORMATION
- ENI Congo Limited
- PROJECT VALUE
- $80.5 million
- DATE AND PERIOD
- 2008, 27 months
- DESCRIPTION
- This integrated upstream\downstream project comprises the complete cycle power generation with a maximum supply capacity of 450 - 480 Mw (combined cycle to be implemented in future). Construction of an open-cycle Power Generation Plant consisted of 2 x 160 Mw gas turbine generators and included all civil works, electromechanical, instrumentation control, fabrication, installation, sand blasting, painting, insulation and precommissioning of the following components: flare system, fuel gas system, diesel oil storage and distribution system, compressed air system, black start gas turbine generators, emergency power generation, closed-circuit water cooling system, service, demi and potable water systems, blow down and closed drain systems, oily sewer system and chemical storage and distribution system, sanitary discharge treatment and storage system, foam/water firefighting system, all civil and structural works, all electrical and instrumentation works, precommissioning, general services, camp facilities, utilities and office services.