
Category: Petroleum & Petrochemical

Construction of 65 kms of gas pipeline 30″ diameter and 24″ diameter from Dukhan Oil Field to the Ras Abu Fontas Power Station

Approximately 0.5 km. of offshore pipeline was installed parallel to existing 16” pipeline from the Escravos Gas Plant facility to the east bank of the Escravos River. An installation of 2 km. of river crossing at a maximum depth of 30 m and installation of 2 km. of onshore pipeline to tie in to Nigeria […]

110 kms of 30″ / 16″ diameter gas pipelines and related station works. Including all testing and commissioning. 10 kms of 24″ / 16″ diameter gas pipeline and related station works. Included all testing and commissioning. 16″ / 24″ gas pipelines installation and testing. Including civil works and pumping stations.